FEASIBILITY STUDY:

FEASIBILITY REPORT:

Preliminary investigation examines project feasibility, the likelihood the system will be useful to the organization. The main objective of the feasibility study is to test the Technical, Operational and Economical feasibility for adding new modules and debugging old running system. All systems are feasible if they are given unlimited resources and infinite time. There are aspects in the feasibility study portion of the preliminary investigation:

Advertisement

TECHNICAL FEASIBILITY:

The technical issue usually raised during the feasibility stage of the investigation includes the following:

OPERATIONAL FEASIBILITY:

Proposed projects are beneficial only if they can be turned out into information systems, which will meet the organization’s operating requirements. Operational feasibility aspects of the project are to be taken as an important part of the project implementation.

Some of the important issues raised are to test the operational feasibility of a project includes the following: –

This system is targeted to be in accordance with the above-mentioned issues. Beforehand, the management issues and user requirements have been taken into consideration. So there is no question of resistance from the users that can undermine the possible application benefits.

The well-planned design would ensure the optimal utilization of the computer resources and would help in the improvement of performance status.

ECONOMIC FEASIBILITY:

A system can be developed technically and that will be used if installed must still be a good investment for the organization. In the economical feasibility, the development cost in creating the system is evaluated against the ultimate benefit derived from the new systems. Financial benefits must equal or exceed the costs. The system is economically feasible. It does not require any additional hardware or software.

FUNCTIONAL REQUIREMENTS:

Number of Modules

After careful analysis the system has been identified to have the following modules:

  1. Administrator module
  2. Travels module
  3. Routes module
  4. Reservations module
  5. Testimonials module.